HAP 2.5 Elevator hoist anchor point
Post-installed hoist point for temporary suspensions during installation and maintenance in elevator shafts
- Material, corrosion: Cast-iron, Multilayer coating
- Head configuration: n/a
- Base materials: Concrete (cracked), Concrete (uncracked)
Choose options
Pack size
- 2 pc
Quantity
Packs
Total Pieces
1
Discounted net, exclusive of 2% handling fee
From Rp6,312,937.50





